Zeebrugge LNG plant (Zeebrugge, Belgium).
28 September 2023
LNG
Customer: Fluxys LNG
Service by: AMPO SERVICE Field Engineering Services
CHALLENGE:
Belgian natural gas operator FLUXYS LNG has requested several times valves commissioning services during plant construction and start-up to AMPO SERVICE.
SOLUTION:
AMPO SERVICE technicians have been on Belgium for several months and years (in different project phases) to support the technical staff of Fluxys LNG and help extend thousands of valves’ service life, supporting the cleaning process of the pipes, assembling internal valve components as well as actively participating in the commissioning and start up processes of the different phases of the project.
AMPO POYAM VALVES has supplied around 1,800 cryogenic butterfly valves and highly engineered ball, globe, gate and check valves for this project.
Other Case Studies
28 September 2023
LNG
Tandem gate valves for the Catalytic Reformer (Power Former) unit at ExxonMobil’s Antwerpen Refinery
CHALLENGE: To engineer and supply high-temperature tandem gate valves with a customized face-to-face distance…
Read more
28 September 2023
LNG
High-temperature (752ºF) metal seated 30” ball valves for Jafurah
CHALLENGE: To deliver large sized, high-temperature metal seated ball valves within an extremely tight…
Read more
28 September 2023
LNG
Cryogenic and non-cryogenic valves for Phase 1 of Port Arthur LNG terminal
CHALLENGE: To deliver over 15,000 highly engineered valves for one of the most strategic…
Read more