OSO 57C Production Optimization Project in Nigeria
28 September 2023
Surface
Customer: Exxon Mobil
Service by: AMPO SERVICE Fast Track
CHALLENGE:
Exxon Mobil requested three fast track and custom-made valves to be delivered in 10-12 weeks for OSO 57C Production Optimization Project in Nigeria. This field is located offshore Nigeria, in Akwa Iborn State, in the Bight of Bonny, and is approximately 12 miles from onshore and 30 miles southwest of the onshore Qua Iboe Terminal (QIT).
SOLUTION:
AMPO POYAM VALVES successfully supplied customized 3 forged pieces trunnion design ball and casted check valves up to 14” with pressure range varying from 900 lbs to 2500 lbs in 10-12 weeks, due to our Fast track services. Check valve seats were hardfaced by a Stellite weld overlay in order to improve valve performance.
Other Case Studies
28 September 2023
Surface
Tandem gate valves for the Catalytic Reformer (Power Former) unit at ExxonMobil’s Antwerpen Refinery
CHALLENGE: To engineer and supply high-temperature tandem gate valves with a customized face-to-face distance…
Read more
28 September 2023
Surface
High-temperature (752ºF) metal seated 30” ball valves for Jafurah
CHALLENGE: To deliver large sized, high-temperature metal seated ball valves within an extremely tight…
Read more
28 September 2023
Surface
Cryogenic and non-cryogenic valves for Phase 1 of Port Arthur LNG terminal
CHALLENGE: To deliver over 15,000 highly engineered valves for one of the most strategic…
Read more